Project-controls templates
Battle-tested templates and dashboards I've built and refined on real GCC projects — plus the external tools I actually use. Free, non-confidential, and ready to adapt.
Templates & dashboards
Production-grade starting points so you don't build from scratch.
EVM Dashboard
Auto-calculating SPI, CPI, EAC, ETC and VAC. Plug in BCWP/BCWS/ACWP weekly and the S-curves and trend charts update themselves.
Download · SoonEOT Claim (SCL aligned)
Structured Extension of Time template: delay-event narrative, contemporaneous records, Time Impact Analysis, entitlement and quantum.
Download · SoonWPR / DPR Report Pack
Executive weekly + daily progress reports: planned vs actual, SPI/CPI snapshot, critical-path status, delays log and 2-week look-ahead.
Download · SoonDelay Log & Risk Register
Combined delay-event log and risk register aligned with AACE RP-68R-11 — contractual reference, severity, mitigation, owner and entitlement.
Download · SoonManhour & Manpower Tracker
Activity-code-based manhour tracking with planned vs actual, productivity index, overrun analysis and a manpower histogram.
Download · SoonProcurement Tracker
PO → GRN → delivery → pending material, with lead-time alerts so material risk surfaces before it hits the programme.
Download · Soon📥 Templates are being finalised for public download. Email me if you'd like early access to any of them.
Tools & references I use
Standards, software and learning resources worth your time.
PMI
PMBOK Guide, PMP® certification and project-management research.
pmi.org →SCL Protocol
The authoritative protocol on delay analysis and disruption claims.
scl.org.uk →AACE International
Recommended Practices for EVM, forensic schedule analysis & risk.
aacei.org →CRPEP Bahrain
Engineering-practice registration for the Kingdom of Bahrain.
crpep.bh →Oracle Primavera P6
The industry-standard scheduling tool for EPC & infrastructure.
oracle.com →Microsoft Power BI
Build executive dashboards from project data — free desktop version.
powerbi.microsoft.com →